topleft
topright
New York (Manhattan) 9/11
Advertisement
New Controller PDF Print E-mail
Written by Administrator   
Tuesday, 08 January 2008

Installed a new system-wide controller today, providing greater speed and agility.

 

I replaced the master controller for the repeater system today, in anticipation of the arrival and installation of our new repeater on Nielton Point.  The new controller runs from a dedicated dual-processor AMD with 1 Gb RAM and is flash-based, reducing power consumption and increasing reliability.  Running from battery power, the system should operate properly during power outages, although we now have a fail-safe backup in the event of power loss.  Since I've written much of the software for the controller, this system provides us with new tools to automatically update information relevant to the coverage area and will provide better analysis and reporting of mountain/hill-top events related to repeater operation and maintenance in the future.

 

We are, however, in test-mode with the new controller and I've noticed we have a ground-loop that I'll be addressing (resulting in the lovely 60 cycle hum you hear during ID and other controller events).

 

Update as of 5/29/2008

I've resolved a few issues with the controller over the winter - the ground-loop issue has been fixed and the programming has finally been completed to my satisfaction.  Next step, the EAS/Earthquake alert system...

 

Last Updated ( Thursday, 29 May 2008 )
 
< Prev

Login Form






Lost Password?

Syndicate

Who's Online

Locations of visitors to this page

System Status Report

Cosmopolis Repeater Status

Repeater:  Up.  EchoLink:  Up.  Status:  Linked.

 
Neilton Repeater Status

System:  Up.  Status:  Linked.

Read more...
 
Olympia Repeater Status

Repeater:  Up.  Status:  Linked. 

 

Wacky News & Info

SHARES Field Day

SHARES will run a separate, but parallel event on Field Day.  From 1800Z to 2100Z this coming Saturday, our voice national net controls will be monitoring the SHARES primary frequency and taking your check-ins from all SHARES members.  Whether you’re in the field for Field Day or at home we are opening our doors to the SHARES community for three hours this Saturday.

 

Read more...
 
National Hurricane Center to Test

The annual WX4NHC On-the-Air Station Test from the National Hurricane Center (NHC) in Miami takes place Saturday, May 31, from 1300-2100 UTC...

 

Read more...
 

Events

Nielton Point Digi

Installed the new digi (NPDIGI) on Friday.  Appears to be working well...

 

Read more...
 
New Controller

Installed a new system-wide controller today, providing greater speed and agility.

 

Read more...
 
Site Hosted by Puget.NET
Joomla Templates by JoomlaShack Joomla Templates